What does the cooperation look like?

01

The Business Stage

Submission and assessment of the inquiry. Followed by the processing of the inquiry and preparation of an offer. Once the offer is agreed the contract is being signed.

The Business Stage
02

Preparation of a project

Technical consultation regarding the design of a specific part, concept of the pressing tool and customer’s requirements on quality.

Preparation of a project
03

Development and design of the tool

Development and design of stamping tool in CAD/CAM system Unigraphics takes approximately 3–4 weeks.

Development and design of the tool
04

Production of the stamping tool

Once the construction is signed off, the production of the stamping tool begins in our own tool shop. The production takes 8-12 weeks depending on the complexity of the tool.

Production of the stamping tool
05

Testing of the tool

Testing the tool in own stamping department followed by an immediate dispatch of the first samples to the customer. The complete measurement report (ISIR) is sent additionally.

Testing of the tool
06

Tool (parts) approval

Testing the tool in own stamping department followed by an immediate dispatch of the first samples to the customer. The complete measurement report (ISIR) is sent additionally.

Tool (parts) approval
07

Serial production of metal parts

Mass-production of the stamped metal parts according to the orders and forecast from the customer.

Serial production of metal parts
08

Assembly

In the case of customer demand, we can provide an assembly of several plastic and metal parts together. We use single purpose and ultrasonic welding machines.

Assembly
09

Inspection

Serially produced metal parts are regularly visually checked and measured according to the customer´s specification.

Inspection
10

Warehouse and dispatch

Serially produced metal parts and assemblies are stored here and delivered by an internal or an external carrier.

Warehouse and dispatch